The end of the manual pitchbook

Head of Product at Kurtosys

Share

Loading the Elevenlabs Text to Speech AudioNative Player...

Is a good pitchbook one that looks right, or one that’s still right by the time someone opens it? Most of our industry has spent years answering the first question. I think that’s the wrong one to be answering.

I’ve sat in enough deck reviews to know how this plays out. A pitchbook gets built, checked and signed off on a Tuesday. By Thursday, the fund performance behind slide six has moved. Nobody catches it until a client does.

The deck’s design was never the problem. The data behind it moved after the deck was signed off, and nothing on the slide told anyone to check again.

Why manual pitchbook production breaks down

Manual pitchbook production breaks down for one structural reason. Presentation software sits downstream of several disconnected systems, and nothing forces those systems to agree with each other by the time a deck goes out the door.

Three places this shows up, every quarter:

  • Performance data lives in one platform, commentary in another. By the time both make it into a single deck, they’ve usually passed through several hands and at least one copy and paste.
  • Disclaimers rely on someone remembering to update them. An approval that expired last quarter can sit quietly on a slide for months, because nothing on the slide flags it.
  • Charts get exported as static images. The image looks right. Whether it still reconciles to the source data is a separate question, and usually an unanswered one.

 

At small scale, a good team catches most of this by hand. At enterprise scale, hand checking becomes the plan, and that’s the point where a workflow problem turns into a governance one, whether the team producing the deck is marketing, sales or client reporting.

The end of the manual pitchbook 1

Why doesn’t adding more review fix it?

I want to say plainly what most firms already sense. Adding process here does not fix the problem. It moves the problem later in the timeline, to a point where it costs more to catch.

Every extra sign off adds a wait. Product specialists become the only people who can push a deck through, so they become a bottleneck by design. Marketing spends its time policing what already went out, rather than building what goes out next. Compliance still only sees the finished deck, at the point where changing it causes the most disruption.

More approval steps were never going to fix a problem that starts before any of them are reached.

Build governance into the deck itself

Here’s how I’d put the choice firms are quietly making right now. Keep adding checkpoints around the deck, and accept that checking will always run a step behind the data. Or connect the deck directly to the data, so checking happens continuously, as the data changes.

A workflow built the second way tends to share four features:

  1. A single, governed data source. Live, approved data pulled straight from a platform like Snowflake or Kurtosys, refreshed continuously so it never has the chance to age between exports.
  2. Design kept separate from data. Templates, layouts and brand rules stay controlled centrally, while the data behind them refreshes on its own schedule.
  3. Compliance built in from the start. Disclosures, footnotes and audit trails update automatically alongside the data they describe, so approval status travels with the number.
  4. Speed without permission sprawl. Sales and marketing teams keep working inside the presentation software they already use, without needing a specialist tool or a change request for a routine update.
This is why we built Studio for Microsoft PowerPoint

This is the exact gap we built Kurtosys Studio for Microsoft PowerPoint to close. Studio links charts and tables directly to approved data sources, keeps a central library of compliant slides and disclosures, and refreshes an entire deck in minutes rather than a re-export and a re-review. Teams keep working inside PowerPoint. Only how much of it they have to re-check by hand changes.

The result, when it works, is unglamorous in the best way. Decks are accurate and compliant on the day someone opens them, weeks after they were built, without anyone staying late to check them by hand.

What makes this possible

I won’t pretend this is a finished story. Firms distributing more content, to more audiences, across more channels, will keep finding new ways for a manual process to fall over. What matters is whether the deck is still correct by the time someone opens it.

If you’re still finding out a number moved after the deck was already in someone’s hands, that’s worth a conversation. Explore Kurtosys Studio for PowerPoint, or get in touch to see it built around your own fund range.

Share this post

About the author

Head of Product at Kurtosys
Kauthar Marek is Head of Product at Kurtosys, where she leads the development of reporting outputs that help investment managers deliver accurate, on-brand client communications at scale. With a background in data analytics, programme execution and enterprise platform implementation at Allan Gray and Schroders, she brings a product lens to what "best in class" reporting actually looks like in practice.

Latest posts

FRAME explained: the FCA’s fund reporting overhaul, and the extra month to respond

CCI: where the industry is in its implementation journey 

CCI explained: what investment managers actually need to know

Cyber resilience under pressure: what actually holds when it matters

Select your region